This paper describes how the City of Richmond (City) is efficiently addressing their sanitary sewer system needsusing alternative project delivery methods and trenchless technology construction.The City of Richmond is located adjacent to San Francisco Bay in northern California. As the City’s population hasincreased, portions of the collection system and the treatment plant have been overwhelmed during high flowscausing overflows into the bay. An organization called San Francisco Baykeeper filed suit against the City in 2005.A 2006 settlement between the City and San Francisco Baykeeper requires the City to improve both the collectionsystem and the treatment plant to eliminate all overflows during a 10 year, 24 hour storm event by September 15,2014.Veolia Water West Operating Service, Inc. (Veolia Water) has a contract with the City to implement capitalimprovements and maintain and operate the City’s sanitary sewer collection system and treatment plant. VeoliaWater is implementing a $68 million program to achieve the “no overflow” mandate by September 15, 2014.Rehabilitation of existing pipes is the quickest and most economical component of the program to implement. Tomake the implementation even quicker, Veolia Water is using an alternate delivery method.The alternate delivery method is a fast-track system where design and construction occur simultaneously. Harris &Associates, Inc. (Harris) first prepared a bid schedule with estimated quantities for all the anticipated rehabilitationwork. While Veolia Water selected a contractor and negotiated unit prices, Harris prepared the first package ofrehabilitation plans. As the contractor constructed the first package, Harris prepared the second package of plans.This process repeated until approximately $3 million of rehabilitation work was constructed.The paper will include advantages and disadvantages of the delivery system, lessons learned, and the benefits itbrings to the trenchless industry.
机译:本文介绍了里士满(城市)的城市如何有效地解决他们的卫生下水道系统需求 采用替代项目交付方法和挖掘技术建设。 里士满市毗邻加州北部的旧金山湾。随着城市的人口有 增加,收集系统的部分和治疗厂在高流动期间被淹没 导致溢出到海湾。一个名为旧金山Baykeeper的组织于2005年对该城市提起诉讼。 城市和旧金山Batekeer之间的2006年,需要城市改善汇集 系统和治疗厂将在10年内消除所有溢流,24小时暴风机赛到9月15日, 2014年。 Veolia Water West Water Moverical Service,Inc。(Veolia Water)与城市合同实施资本 改进和维护,运营城市卫生下水道收集系统和治疗厂。威立雅 水正在实施6800万美元的计划,以达到2014年9月15日的“无溢出”任务。 现有管道的康复是实施计划的最快和最经济的组成部分。到 使得实现更快,威曲水正在使用另外的递送方法。 替代递送方法是一种快速轨道系统,其中设计和施工同时发生。哈里斯& Associates,Inc。 工作。虽然Veolia Water选择了承包商和谈判单位价格,但哈里斯编制了第一个包 康复计划。由于承包商构建了第一个包装,哈里斯准备了第二份计划。 这一过程重复,直到建立了大约300万美元的康复工作。 本文将包括交付系统的优缺点,培训的经验教训,以及它的好处 带来了无光的行业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号