Economic and Conservation Evaluation of Capital Renovation Projects: Harlingen Irrigation District Cameron County No. 1 Canal Meters and Telemetry Equipment, Impervious-Lining of Delivery Canals, Pipelines Replacing Delivery Canals, and On-Farm Delivery-Site Meters

机译:基本建设项目的经济和保护评价:哈林根灌区卡梅伦县第一号管道仪表和遥测设备,输水管道的防渗层,输水管道的更换管道和农用现场站点水表

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Initial construction costs and net annual changes in operating and maintenance expenses are identified for the capital renovation project proposed by Harlingen Irrigation District Cameron County No. 1 to the North American Development Bank (NADBank). Both nominal and real, expected economic and financial costs of water and energy savings are identified throughout the anticipated useful lives for each of the four components of the proposed project (i.e., canal meters and telemetry equipment, impervious-lining of delivery canals, 24" pipelines replacing delivery canals, and on-farm delivery-site meters). Sensitivity results for both the cost of water savings and cost of energy savings are presented for several important parameters. Expected cost of water savings and cost of energy savings for each of the four components are aggregated into a composite set of cost measures for the total proposed project. Aggregate cost of water savings is estimated to be $31.37 per ac-ft and energy savings are measured at an aggregate value of $0.0002253 per BTU (i.e., $0.769 per kwh). In addition, expected values are indicated for the Bureau of Reclamation?s three principal evaluation measures specified in the Public Law 106-576 legislation. The aggregate initial construction cost per ac-ft of water savings measure is $26.87 per ac-ft of water savings. The aggregate initial construction cost per BTU (kwh) of energy savings measure is $0.0001603 per BTU ($0.547 per kwh). The amount of initial construction costs per dollar of total annual economic savings is estimated to be -1.30.
机译:哈林根灌溉区第一喀麦隆县向北美开发银行(NADBank)提出的基本建设项目确定了初始建设成本以及运营和维护支出的年度净变化。在拟议项目的四个组成部分(即运河水表和遥测设备,不透水的输送管道衬砌,24英寸)的整个预期使用寿命中,确定了节水和节能的名义和实际,预期经济和财务成本。用管道代替输水管道,以及农场上的输水现场仪表),同时给出了几个重要参数的节水成本和节能成本的敏感度结果:每个项目的预期节水成本和节能成本整个拟议项目的四个成本衡量指标合计为四个部分,节水总成本估计为每英呎31.37美元,节能量的总价值为每BTU 0.0002253美元(即每千瓦时0.769美元) )此外,还为填海局制定了106-576号公法中规定的三种主要评估措施的期望值。例如,每英亩节水措施的初始建筑成本为每英亩节水26.87美元。每BTU(kwh)的节能措施的初始建设总成本为$ 0.0001603 / BTU($ 0.547 / kwh)。每美元年度经济总节省的初始建设成本估计为-1.30。