首页> 外文会议>IEEE International Conference on Industrial Engineering and Engineering Management >An Analysis of Project Risks Using the Non-parametric Bootstrap Technique
【24h】

An Analysis of Project Risks Using the Non-parametric Bootstrap Technique

机译:使用非参数自引导技术分析项目风险

获取原文

摘要

Standard statistical techniques do not always provide answers to project risks questions because often there are no parametric distributions on which significance can be estimated. Resampling methods provide a battery of tests that can be used in such circumstances. In the past few years these methods have been explored theoretically and are now employed frequently. The aim of the paper is to highlight the motivations for using a model base on bootstrap in typical project risk analysis. Bootstrap method for decreasing the standard deviation of project risks is described. We give a numerical example for better understanding.
机译:标准统计技术并不总是为项目风险问题提供答案,因为通常没有参数分布,可以估计重要性。重采样方法提供可在这种情况下使用的测试。在过去的几年里,这些方法理论上已经探讨,现在经常雇用。本文的目的是突出典型项目风险分析中使用模型基础的动机。描述了用于减少项目风险的标准偏差的引导方法。我们提供了一个数字示例以更好地理解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号