Successful Long Term Biosolids Planning: Culmination of a Decade Long Biosolids Master Plan

机译:成功的长期生物溶解计划:十年长期生物溶解总体计划的高潮

获取原文

摘要

The Elledge Wastewater Treatment Plant (WWTP) Centralized Biosolids Drying Facility is the culmination of the decade long implementation of a comprehensive biosolids management master plan conducted by the City of Winston-Salem in the early 1990’s. The master plan provided the roadmap for the biosolids treatment and disposal systems for two wastewater treatment plants, Elledge WWTP and Muddy Creek WWTP, which at the time were dedicated to a liquid land application program. The master plan recommended a phased approach to implementation in which they would first migrate to a Class B cake application program through dewatering improvements at the two plants and then ultimately a Class A program. This allowed the cost of the overall transition to be phased over time as well as for technological advances in Class A systems to develop and for the regulatory framework for biosolids disposal in North Carolina to establish itself. The Elledge WWTP Centralized Biosolids Facility is the largest thermal drying system in the Carolinas at 36 dry metric tonnes per day (dmtpd) (40 dtpd) and was designed as a fully automated centralized biosolids dewatering and drying facility for the two Winston-Salem plants (Figure 1). Implementation of the final phase of the master plan included innovative design approaches including centralization of all biosolids treatment and handling at one facility and the use of three-dimensional (3D) design techniques. The thermal drying system also incorporated sustainable concepts including the use of digester gas to supply nearly 50% of all fuel usage and heat recovery for heating of the existing digesters and building heat. The centralized biosolids treatment facility is in service and has met the long term objectives for Winston-Salem originally conceived during the comprehensive biosolids master plan.
机译:该Elledge污水处理厂(污水处理厂)集中式生物固体干燥设备是长达十年的执行经市温斯顿 - 塞勒姆的在90年代初进行了全面的生物固体管理总体规划的高潮。总体规划为两个污水处理厂,污水处理厂Elledge和泥泞溪WWTP,这在当时是专用于液体土地应用程序的生物固体处理和处置系统所提供的路线图。总体规划建议分阶段实施它们将通过脱水的改进在两个植株第一迁移至B类蛋糕应用程序,然后最终是一类程序。这使得随着时间的推移将逐步整体过渡的成本,以及在A级系统的技术进步,开发和生物固体处置在北卡罗来纳州建立自己的监管框架。所述Elledge WWTP集中生物固体设施是在卡罗来纳在每天36干吨(dmtpd)(40 DTPD)最大热干燥系统和被设计成一个完全自动化的集中的生物固体脱水和干燥设施用于两个温斯顿塞勒姆植物(图1)。总体规划的最后阶段的实施包括创新的设计方法,包括所有污泥处理的集中和在一个设施处理和使用的三维(3D)的设计技术。热干燥系统还并入可持续概念,包括使用消化器气体为现有沼气池加热和建筑供热近50%的所有的燃料使用和热回收的。集中式污泥处理设施是服务,满足了最初的综合污泥总体规划中设想的温斯顿 - 塞勒姆的长期目标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号