首页> 外文会议>Residuals and Biosolids Conference >Lessons Learned in Design and Commissioning of Digester Gas CHP Energy Recovery Projects in a Design/Build Project Delivery Environment
【24h】

Lessons Learned in Design and Commissioning of Digester Gas CHP Energy Recovery Projects in a Design/Build Project Delivery Environment

机译:在设计/建造项目交付环境中进行的沼气CHP能量回收项目的设计和调试中吸取的教训

获取原文

摘要

The design/build delivery method for combined heat and power (CHP) systems has theadvantage of customizing CHP systems to meet Owner’s budget, compressing the design andconstruction schedule and providing the Owner a unified contactor/engineer team during start up.This paper is a case study for the design and commissioning associated with the 2.1 megawatt(MW) CHP system at the Gwinnett County F. Wayne Hill Water Resources Center (FWHWRC)and a 1.6 MW CHP system at the City of Atlanta R. M. Clayton WWTP. This paper willprovide the pros and cons from the Owner’s, Engineer’s, and Contractor’s perspective.
机译:热电联产(CHP)系统的设计/建造交付方法具有以下特点: 定制CHP系统以满足业主预算的优势,压缩了设计和 施工时间表,并在启动期间为业主提供统一的接触者/工程师团队。 本文是与2.1兆瓦相关的设计和调试案例研究 格温内特县韦恩山水资源中心(FWHWRC)的(MW)CHP系统 以及亚特兰大市Clayton污水处理厂的1.6兆瓦热电联产系统。本文将 从所有者,工程师和承包商的角度提供利弊。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号