首页> 外文会议>Conference on coastal engineering practice >ROCKEFELLER REFUGE GULF SHORELINE PROTECTION DEMONSTRATION
【24h】

ROCKEFELLER REFUGE GULF SHORELINE PROTECTION DEMONSTRATION

机译:洛克菲勒避难海湾海岸线保护示范

获取原文

摘要

Currently, 25 to 35 square miles of wetlands are lost each year along coastal Louisiana. The shoreline along the Rockefeller Wildlife Refuge in Cameron Parish is experiencing some of the highest rates of loss, with estimates of long-term shoreline retreat ranging from 30 to 40 ft/year (Byrnes et ah 1995). To combat the direct loss of wetlands at Rockefeller Refuge, the Louisiana Office of Coastal Protection and Restoration (OCPR) teamed with the National Marine Fisheries Service (NMFS) and Louisiana Department of Wildlife and Fisheries (LDWF) to implement the Rockefeller Refuge Gulf Shoreline Stabilization Project. The project intent is to halt erosion along the 9.2 mile portion of the Refuge west of Joseph Harbor Bayou. Due to the challenges presented by extremely soft soils, requirement to protect the marsh shoreline for up to hurricane conditions, and limited construction budget, a smaller demonstration project utilizing three alternative designs was proposed and constructed in Fall/Winter of 2009. The alternatives constructed include: gravel beach fill, light-weight aggregate core breakwater, and a low crested "reef breakwater. Following construction, a monitoring plan was implemented to assess the ability of the three alternatives to combat erosion along the shoreline. The monitoring plan was designed to collect a comprehensive set of data to document the performance of the alternatives for one year following construction. A metocean data station was installed at the project site to collect wave, wind, and tide data for 6 months. Concurrent measurements of waves offshore and leeward of the breakwaters were conducted to assess wave transmission. In addition, the project area was surveyed approximately every four months to document the structure geometry, shoreline and nearshore profile changes, and structure settlement. The later was performed by surveying settlement plates that were installed during construction. In addition, a separate control area near the project location was surveyed to assess shoreline retreat with no shoreline protection. Aerial photography was obtained during each survey to visually document the conditions during the surveys.
机译:目前,25至35平方英里的湿地,每年在沿海路易斯安那丢失。沿着洛克菲勒野生动物保护区在卡梅伦教区的海岸线正在经历一些损耗率最高的,长期岸线后退范围从30到40英尺/年的估计(伯恩斯等人1995年)。为了打击湿地在洛克菲勒避难所,海岸保护和恢复(OCPR)的路易斯安那州办公室的直接损失与国家海洋渔业局(NMFS)和野生动物和渔业(LDWF)的路易斯安那部门联手实施洛克菲勒庇护湾岸线稳定项目。该项目目的是沿着约瑟夫港河口的避难所西部9.2英里部分停止侵蚀。由于极软土所带来的挑战,要求以保护湿地海岸线长达飓风情况下,和有限的施工预算,采用三个备选设计更小的示范项目提出并构建秋/冬2009年构建的备选方案包括: :砾石海滩填料,轻质骨料核心防波堤和低凤头“礁堤继建设,监测计划的实施是为了评估三个替代方案,以沿海岸线作战侵蚀的能力监测计划旨在收集。一套完整的数据记录为一年以下建设方案的性能。一个海洋气象数据站被安装在项目现场收集波浪,风和6个月的潮汐数据,近海海浪的并行测量和背风的防波堤进行了评估波传输。此外,项目区被勘测approximat伊利每四个月来记录结构的几何形状,海岸线和近岸配置文件的更改和建筑物沉降。后来通过测量施工过程中安装的结算板中进行。此外,该项目位置附近的一个单独的控制区进行了调查,以评估没有海岸线保护岸线后退。每个调查,以在视觉上记录调查过程中的条件中获得的航空摄影。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号