首页> 外文会议>Conference on coastal engineering practice >ROCKEFELLER REFUGE GULF SHORELINE PROTECTION DEMONSTRATION
【24h】

ROCKEFELLER REFUGE GULF SHORELINE PROTECTION DEMONSTRATION

机译:洛克菲勒翻新湾岸线保护示范

获取原文

摘要

Currently, 25 to 35 square miles of wetlands are lost each year along coastal Louisiana. The shoreline along the Rockefeller Wildlife Refuge in Cameron Parish is experiencing some of the highest rates of loss, with estimates of long-term shoreline retreat ranging from 30 to 40 ft/year (Byrnes et ah 1995). To combat the direct loss of wetlands at Rockefeller Refuge, the Louisiana Office of Coastal Protection and Restoration (OCPR) teamed with the National Marine Fisheries Service (NMFS) and Louisiana Department of Wildlife and Fisheries (LDWF) to implement the Rockefeller Refuge Gulf Shoreline Stabilization Project. The project intent is to halt erosion along the 9.2 mile portion of the Refuge west of Joseph Harbor Bayou. Due to the challenges presented by extremely soft soils, requirement to protect the marsh shoreline for up to hurricane conditions, and limited construction budget, a smaller demonstration project utilizing three alternative designs was proposed and constructed in Fall/Winter of 2009. The alternatives constructed include: gravel beach fill, light-weight aggregate core breakwater, and a low crested "reef breakwater. Following construction, a monitoring plan was implemented to assess the ability of the three alternatives to combat erosion along the shoreline. The monitoring plan was designed to collect a comprehensive set of data to document the performance of the alternatives for one year following construction. A metocean data station was installed at the project site to collect wave, wind, and tide data for 6 months. Concurrent measurements of waves offshore and leeward of the breakwaters were conducted to assess wave transmission. In addition, the project area was surveyed approximately every four months to document the structure geometry, shoreline and nearshore profile changes, and structure settlement. The later was performed by surveying settlement plates that were installed during construction. In addition, a separate control area near the project location was surveyed to assess shoreline retreat with no shoreline protection. Aerial photography was obtained during each survey to visually document the conditions during the surveys.
机译:目前,路易斯安那州沿海地区每年损失25至35平方英里的湿地。喀麦隆教区洛克菲勒野生动物保护区沿岸的海岸线遭受的损失率最高,估计长期海岸线向后退的幅度为每年30至40英尺(Byrnes等,1995)。为了应对洛克菲勒避难所湿地的直接损失,路易斯安那州海岸保护与恢复办公室(OCPR)与国家海洋渔业局(NMFS)和路易斯安那州野生生物和渔业部(LDWF)合作实施了洛克菲勒避难所墨西哥湾岸线稳定化计划项目。该项目的目的是阻止约瑟夫港河口河以西9.2英里避难区的侵蚀。由于极软的土壤所带来的挑战,需要在高达飓风条件下保护沼泽海岸线以及有限的建设预算,因此在2009年秋冬季提出并建造了一个采用三种替代设计的小型示范项目。所建造的替代方案包括:砾石滩填土,轻质骨料防波堤和低顶的“礁石防波堤”。施工后,实施了一项监测计划,以评估三种替代方法抵抗海岸线侵蚀的能力。该监测计划旨在收集全面的数据集,用以记录建造后一年内替代方案的性能;在项目现场安装了一个海洋数据站,以收集6个月的海浪,风和潮汐数据。进行了防波堤评估波的传播,此外,对项目区域进行了近似调查每四个月至少记录一次结构几何形状,海岸线和近岸剖面变化以及结构沉降。后者是通过对在施工过程中安装的沉降板进行测量来进行的。此外,还对项​​目所在地附近的一个单独的控制区进行了调查,以评估没有海岸线保护的海岸线撤退情况。在每次调查期间均获得了航空摄影,以直观方式记录调查期间的状况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号