Key Technology Review of Closure Design and Construction of Ultra-Large Closure Gap in the Qing Cao Sha Reservoir Engineering

机译:青草沙水库工程封闭设计及超大封闭缝施工关键技术综述

获取原文

摘要

Due to the 50km~2 wide one-time reclamation which has not yet occurred worldwidely, closing the closure gap became a key technology of constructing the Qing Cao Sha reservoir. Based on a large amount of scientific experiments, the design scheme is proposed and the key control process during construction organization as well, namely the site selection of closure gap, the technical routine of hydraulic design of 800m long single closure gap scheme, the innovation of protection structure, the closure scheme using section-steel frame cage for the first time, the hydraulic monitor during closing and the key technology during construction. And the success of such reclamation in deepwater would provide positive reference for other similar ultra-large closure gaps.
机译:由于世界范围内尚未进行过50 km〜2宽的一次填海,因此,关闭闭合间隙已成为建设青草沙水库的一项关键技术。在大量科学实验的基础上,提出了设计方案以及施工组织过程中的关键控制过程,即封闭缝的选址,800m长单封闭缝方案的水力设计技术程序,水力压路机的创新。保护结构,首次采用型钢框架保持架的关闭方案,关闭期间的液压监控器以及施工期间的关键技术。这种深水填海的成功将为其他类似的超大型封闭间隙提供积极的参考。

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号