...
首页> 外文期刊>Journal of natural gas science and engineering >Field trial of a modified DFIT (pump-in/flowback) designed to accelerate estimates of closure pressure, reservoir pressure and well productivity index
【24h】

Field trial of a modified DFIT (pump-in/flowback) designed to accelerate estimates of closure pressure, reservoir pressure and well productivity index

机译:用于改进的DFIT(泵送/流量)的现场试验,旨在加速闭合压力,储层压力和生产率指数的估计

获取原文
获取原文并翻译 | 示例
           

摘要

A problem with the conventional diagnostic fracture injection test (DFIT) design, which involves analysis of the pressure falloff after the pump is shut-off, is the long test times required to achieve closure pressure (p(c)), a proxy for minimum in-situ stress, and after-closure flow regimes that can be analyzed for reservoir pressure in (p(r)) and transmissibility.
机译:传统诊断骨折注入试验(DFIT)设计的问题,涉及泵关闭后的压力衰退的分析,是实现闭合压力所需的长测试时间(P(c)),最小的代理 原位应力,以及可以分析的储层压力(P(R))和传动率的闭合后流动制度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号