Innovative Pipeline Cost Estimating for Colorado Water Supply Planning

机译:科罗拉多州供水计划的创新管道成本估算

获取原文

摘要

Planning for Colorado's water future includes addressing infrastructure needs associated with meeting future municipal and industrial demands. As part of the Colorado Water Conservation Board's (CWCB) Statewide Water Supply Initiative, CWCB developed reconnaissance-level cost estimates for several pipelines that have been discussed by various entities across the state. The scale of the proposed pipelines is significant, conveying large flows from across the Continental Divide, and even across state lines, to the eastern edge of the Rockies where most of the state's population is concentrated. To compare these major projects, CWCB and CDM developed planning-level cost estimates with considerable detail given the long term of the planning horizon. This comprehensive effort required collaboration between planning engineers and experts in design and construction cost estimation. Many of the unit costs were developed using existing tools intended for design phases. Care was taken to make the methodologies and the tools transferrable to other projects. This unique reconnaissance-level cost estimating project is thus relevant to water supply planners, and anyone interested in the early stages of large pipeline projects or pipeline cost estimation in general.
机译:科罗拉多州未来水的规划包括满足与满足未来市政和工业需求相关的基础设施需求。作为科罗拉多州水利保护委员会(CWCB)州供水计划的一部分,CWCB为多条管道制定了侦察级成本估算,该估算已由全州各实体进行了讨论。拟议中的管道规模巨大,将大流量从整个大陆分界线甚至州际线输送到落基山脉的东部边缘,该州的大部分人口都集中在此。为了比较这些主要项目,CWCB和CDM制定了规划级别的成本估算,考虑到长期的规划前景,该估算相当详细。这项全面的工作需要规划工程师和专家在设计和建造成本估算方面进行协作。许多单位成本是使用用于设计阶段的现有工具开发的。注意使方法和工具可移植到其他项目。因此,这个独特的侦察级成本估算项目与供水计划者以及任何对大型管道项目的早期阶段或总体上对管道成本估算感兴趣的人有关。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号