Design and Construction of a Relief Sewer Siphon Under the Santa Clara River by Microtunneling

机译:微隧道设计的圣克拉拉河下泄水弯管设计与施工

获取原文

摘要

The Sanitation Districts of Los Angeles County (Districts) own, operate and maintain a wastewater treatment and collection system that includes approximately 1,300 miles of sanitary sewers ranging in diameter from 8-inch to 144-inch. This project is the last of a series of projects that provides relief for the District 32 Main Trunk Sewer system, which serves the Santa Clarita Valley. This relief sewer siphon project was successfully constructed by microtunneling a 60-inch steel casing with a 48-inch fiberglass carrier pipe at a depth of 40 feet below the unimproved Santa Clara River at a construction cost of $7.7 million. The 28-foot diameter, 80-foot deep microtunneling shafts were constructed by sinking a concrete caisson without dewatering due to the inability to discharge groundwater into the river because of environmental and permitting restrictions. The project was successfully completed in August 2010.
机译:洛杉矶县(区)的卫生区拥有,运营和维护废水处理和收集系统,该系统包括约1,300英里(直径从8英寸到144英寸)的下水道。该项目是为圣克拉丽塔河谷提供服务的32区干线下水道系统减灾的一系列项目中的最后一个。该泄洪下水道虹吸项目是通过将60英寸的钢制套管和48英寸的玻璃纤维载管微隧道化到未经改进的圣塔克拉拉河下方40英尺深处而成功建设的,建设成本为770万美元。直径28英尺,深80英尺的微型隧道竖井是通过沉没混凝土沉箱而建造的,由于环境和允许的限制而无法将地下水排入河流,因此不进行脱水。该项目于2010年8月成功完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号