The Santa Margarita River Bridge Replacement Project: Overcoming Construction and Planning Challenges in Rebuilding Railway Infrastructure

机译:Santa Margarita River Bridge更换项目:克服铁路基础设施的建设和规划挑战

获取原文

摘要

Slide 1: Title Slide 2: Presentation Overview Slide 3: Introduction to the project location - nature of traffic and the LOSSAN corridor Slide 4: Corridor update - New policies for project management and securing work windows Slide 5: Project Introduction - History of the bridge and an overview of the site. Slide 6: Project Introduction - History of the bridge and an overview of the site. Noting the environmental concerns at this location - both with changing seasonal conditions and sensitive habitats.
机译:幻灯片1:标题幻灯片2:演示概述幻灯片3:项目位置简介 - 流量的性质和损失走廊幻灯片4:走廊更新 - 项目管理和保护工作的新策略Windows 5:项目介绍 - 桥梁历史并概述了该网站。幻灯片6:项目介绍 - 桥梁的历史和网站的概述。注意到这个位置的环境问题 - 都与不断变化的季节性条件和敏感的栖息地。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号