首页> 外国专利> Method of constructing railway infrastructure for city involves using existing lines to form peripheral line infrastructure and using pre-fabicated concrete casings to form station area in river

Method of constructing railway infrastructure for city involves using existing lines to form peripheral line infrastructure and using pre-fabicated concrete casings to form station area in river

机译:用于城市的铁路基础设施的建设方法包括利用现有线路形成外围线路基础设施,以及使用预制混凝土套管形成河流中的车站区域

摘要

The method of constructing a railway infrastructure for a city involves using the existing lines to form a peripheral line infrastructure. Reinforced concrete casings are prefabricated in dry docks in mass production and placed in waterways (4) to form a support for additional railway lines. Earth can be displaced from the city centre using excavators to provide a space for prefabricated buildings.
机译:为城市建造铁路基础设施的方法包括使用现有线路来形成外围线路基础设施。钢筋混凝土套管在批量生产的预制船坞中预制,并放置在水道(4)中,以为其他铁路线提供支撑。可以使用挖掘机将土壤从市中心移开,为预制建筑物提供空间。

著录项

  • 公开/公告号FR2802161A1

    专利类型

  • 公开/公告日2001-06-15

    原文格式PDF

  • 申请/专利权人 WIECZOREK JULIEN;

    申请/专利号FR19990015454

  • 发明设计人 WIECZOREK JULIEN;

    申请日1999-12-08

  • 分类号B61B1/00;

  • 国家 FR

  • 入库时间 2022-08-22 01:07:46

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号