TRAVIS SPUR RAIL BRIDGE REPLACEMENT ABC TECHNIQUES IN A DESIGN BUILD PROJECT

机译:特拉维斯跑轨桥替换ABC技术在设计构建项目中

获取原文

摘要

One of the many challenges to be overcome during Goethals Bridge Replacement Project was the replacement of the existing Travis Spur Rail Bridge (TSRB), located near the east end of the project limits, and crossing over I-278 near the Goethals Bridge toll plaza. The original TSRB, consisting of a 7-span, single track crossing, was replaced to allow for widening of the I-278 corridor below. Due to operational needs of the owner, NYC Economic Development Corp, TSRB could only be removed from service for a single 60-hour weekend. Roll-in accelerated bridge construction techniques where thus required to replace the crossing. The crossing was replaced without closing I-278 to through traffic, except for a short 10-hour window for demolition of TSRB. The new TSRB consists of a ballasted, through girder design, supported on two-column bents, founded on drilled shafts. In order to make the weekend closure schedule, the two spans were erected within the project right-of-way, adjacent to the TSRB alignment while foundation work proceeded at the site. Drilled shafts and column were located to avoid existing substructure and utilities. Precast cap beams were installed during the weekend closure using a two-crane pick. The installation of the south pier cap beam was further complicated in that it had to be installed under the existing Gulf Avenue span to remain, while being installed over the rebar of the new pier columns. With the piers complete, the new spans were rolled into place, with ballast and track already in place, atop self-propelled mobile transporters (SPMTs).
机译:在歌舞桥替换项目期间要克服的许多挑战之一是更换现有的Travis爆炸桥(TSRB),位于项目限额的东端附近,并在歌舞桥桥梁广场附近的I-278交叉。由7跨度,单轨道交叉组成的原始TSRB被替换为允许在下面的I-278走廊扩大。由于业主的业务需求,纽约州经济发展公司,TSRB只能从服务中删除60小时周末。滚动加速桥梁施工技术,因此需要更换交叉。除了拆除TSRB的短短10小时窗口外,在不关闭I-278的情况下替换了交叉。新的TSRB通过压载,通过梁设计组成,支撑在两柱箱上,在钻井轴上成立。为了使周末关闭时间表,两种跨度在项目中竖立在项目中,毗邻TSRB对准,而在该网站上进行基础工作。定位钻井和柱以避免现有的子结构和公用事业。使用双绞线拾取期间安装预制帽梁。南墩帽梁的安装进一步复杂,因为它必须安装在现有的海湾大道范围内保持在新码头列的钢筋上。随着码头完成,新跨度已滚到原地,镇流器和轨道已经到位,顶部是自行式移动运输车(SPMTS)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号