首页> 外文期刊>Engineering news-record >Boston Rail Project Applies ABCs of Rapid Bridge Building
【24h】

Boston Rail Project Applies ABCs of Rapid Bridge Building

机译:波士顿铁路项目适用快速桥梁建筑的基础知识

获取原文
获取原文并翻译 | 示例
       

摘要

Massachusetts is following the lead of other states and embracing accelerated bridge construction, or ABC, using the method not only for highway spans but also for rail structures in Boston's Fairmont Corridor project.The $174-million commuter-rail project, under way since 2004, is now in its second phase. The 9.2-mile corridor runs through urban neighborhoods south of Boston and includes construction of four new stations and three bridge replacements. Phase one, completed in 2007 for $39 million, included repairs of six bridges and improvements at three stations.
机译:马萨诸塞州正在效仿其他州,并开始采用加速桥梁的建设方法,该方法不仅适用于高速公路跨度,而且适用于波士顿费尔蒙特走廊项目的铁路结构。自2004年以来,这项耗资1.74亿美元的通勤铁路项目一直在进行,现在处于第二阶段。 9.2英里长的走廊贯穿波士顿以南的城市社区,包括建造四个新车站和三座桥梁。第一阶段于2007年完成,耗资3,900万美元,包括修理六座桥梁和改善三个车站的状况。

著录项

  • 来源
    《Engineering news-record》 |2012年第15期|p.21|共1页
  • 作者

    Johanna Knapschaefer;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:13:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号