首页> 外国专利> Bridge building system for railway viaduct, carries piling crane and deck section crane, mounted on rails snd is relatively rapid and simple to use

Bridge building system for railway viaduct, carries piling crane and deck section crane, mounted on rails snd is relatively rapid and simple to use

机译:铁路高架桥的桥梁建筑系统,带有打桩起重机和桥面起重机,安装在轨道上,安装起来相对较快且易于使用

摘要

As each section (4d) of the bridge deck is moved out past the end of the previous section (4a) it is supported by a crane (8), via cables (12). Carried on the section (4d) is a foundation crane (6). The foundation crane (6) moved to the outer end of the section and is used to drive foundation piles (2) to support the junction between one section and the next. After the foundation is complete, the outer section is dropped into place and the process repeated.
机译:当桥面板的每个部分(4d)移出前一个部分(4a)的末端时,它由起重机(8)通过电缆(12)支撑。在部分(4d)上承载的是基础起重机(6)。基础起重机(6)移动到该部分的外端,并用于驱动基础桩(2)以支撑一个部分与下一个部分之间的接合处。基础完成后,将外部放置到位并重复该过程。

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号