首页> 外文会议>2011 IEEE 9th Latin American Robotics Symposium and IEEE Colombian Conference on Automatic Control >Problems associated with the simultaneous design of a spray drying tower
【24h】

Problems associated with the simultaneous design of a spray drying tower

机译:与喷雾干燥塔同时设计有关的问题

获取原文

摘要

This paper mentions the integrated design strategy and process control system, describing the problems in each stage associated with this design strategy, when applied to a spray drying tower for natural dyes. Initially, part of a phenomenological based semiphysical model of concentrated parameters, which describes the main dynamic process and has been validated in another work. Then, the control pairing is established to proceed with controllability analysis using Lie Algebra's. Once, the regions of controllability of the process are established, a PID controller is tuned. Finally the model is simulated in an open loop and a closed loop to show the advantages of simultaneous design approach.
机译:本文提到了集成的设计策略和过程控制系统,描述了当应用于天然染料的喷雾干燥塔时,与该设计策略相关的每个阶段中的问题。最初,是基于现象学的集中参数半物理模型的一部分,该模型描述了主要的动态过程,并在另一项工作中得到了验证。然后,建立控制配对以使用李代数进行可控性分析。一旦建立了过程的可控制区域,就对PID控制器进行了调整。最后,在开环和闭环中对模型进行仿真,以显示同步设计方法的优点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号