首页> 外文会议>2011 International Conference on Electric Technology and Civil Engineering >Monitoring and analysis of East Diaoyutai Station on the 9th line of Beijing subway
【24h】

Monitoring and analysis of East Diaoyutai Station on the 9th line of Beijing subway

机译:北京地铁9号线钓鱼台东站监测分析

获取原文

摘要

Deep excavation engineering is a dynamic and complex system where the soil and the support structure interact. By analysis of information of monitoring and surveying, the distortion of the earth can be learned and the change direction can be forecasted. Deep excavation of East Diaoyutai Station on the 9th line of Beijing subway is taken as an example, workers inspected earth surface displacement around deep excavation, horizontal displacement of stake body, horizontal displacement of stake peak, and steel brace axis stress on the scene, and then analyzed the data. And then work state of support structure can be mastered at any moment, which can guide the excavation and construction.
机译:深挖工程是一个动态而复杂的系统,其中土壤与支撑结构相互作用。通过对监测和测量信息的分析,可以了解地球的变形并预测其变化方向。以北京地铁9号线钓鱼台东站的深基坑工程为例,工人对深基坑周围的地表位移,桩体水平位移,桩尖水平位移和钢结构进行了检查。支撑轴在场景上的应力,然后分析数据。然后可以随时掌握支撑结构的工作状态,可以指导开挖和施工。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号