首页> 外文会议>IEEE Power and Energy Society General Meeting >Integration of Wind Power into Alberta's Electric System and Market Operation
【24h】

Integration of Wind Power into Alberta's Electric System and Market Operation

机译:将风力集成到艾伯塔省的电力系统和市场运营中

获取原文

摘要

At the present time there is nearly 6 GW of interest in wind power development into a nearly 12 GW Alberta Integrated Electric System (AIES). Integration of large-scale wind power into the AIES presents significant challenges to both system and market operation. First, we need to understand and identify the impacts on current system and market operation based on specific characteristics of the AIES. Second, we need to assess and identify potential mitigation solutions for the AIES. Then in concert with industry, we need to design and implement the solutions and incorporate these into business practices of AIES system and market operation. This paper will present and discuss related work done or lead by the AESO in order to accommodate large scale wind power development in AIES.
机译:目前,风电发展近6 GW的兴趣进入近12个GW alberta集成电动系统(Aie)。将大型风力集成到AIE中对系统和市场运营具有重大挑战。首先,我们需要了解并确定基于AIE的特定特征的当前系统和市场运行的影响。其次,我们需要评估和识别AIE的潜在缓解解决方案。然后,与行业进行音乐会,我们需要设计和实施解决方案并将这些解决方案纳入Aies系统和市场运营的商业实践。本文将展示并讨论AESO的相关工作或通过AESO举办的相关工作,以适应AIE的大规模风力发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号