Montana Alberta Tie Line - North America's first international merchant transmission line

机译:蒙大拿艾伯塔省领带线 - 北美的第一个国际商船线

获取原文

摘要

This paper describes some of the experiences in developing Montana Alberta Tie Line (MATL) one of the first merchant power line projects between Canada and United States. The MATL project was officially launched on February 2005 with the announcement of the first open season. It is expected to be in commercial operation by 2011. The MATL project consists of 345 km of 230kV AC transmission with power flows pre-scheduled and regulated by a 300 MW phase shifting transformer. The project connects Alberta's southern most 240kV grid near Lethbridge to Montana's 230kV grid near Great Falls. The rights to use the transmission line were fully subscribed by wind developers through 2 open season processes. The MATL project has received all necessary regulatory approvals and has secured necessary financing through the stimulus funding via WAPA. Construction is slated to start in 2010 with commercial operation expected in 2011.
机译:本文介绍了Montana Alberta Tie Line(MATL)的一些经验,这是加拿大和美国第一款商业电力线项目之一。 MATL项目于2005年2月正式启动,首次开放季节宣布。预计到2011年将在商业运营中。Matl项目由345公里的230kV交流传输组成,功率流量预定,由300 MW相移变压器进行调节。该项目将艾伯塔省的南部最近240kV栅格连接到Lethbridge至Montana的230kv网格,靠近大瀑布。使用传输线的权利通过2个开放季节流程完全由风开发商提供。 MATL项目已收到所有必要的监管批准,并通过WAPA通过刺激资金获得必要的融资。建设在2010年开始于2010年,预计2011年的商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号