【24h】

THE NEW GENERATION NUCLEAR POWER PLANT SIMULATOR - THE LUNGMEN ABWR SIMULATOR

机译:新一代核电站模拟机-龙门水电厂模拟机

获取原文

摘要

The Lungmen Advanced Boiling Water Reactor (ABWR) Full Scope Simulator (FSS) is the first simulator that is built for the new generation of nuclear power plants that is in full compliance with ANSI/ANS-3.5-1998. The Lungmen FSS is implemented in a total PC Windows environment. Its core modeling is based on a best estimate computer code, TRACS/NEMO. The complete modeling of FSS, including the core modeling and modeling of 105 plant systems, is hosted in one PC. A primary/backup server configuration ensures continuous operation of the FSS. The FSS also provides a soft panel feature. This makes the whole system portable.This paper describes the hardware, software and implementation process used for the Lungmen FSS. Due to the feet that the Lungmen FSS is implemented in parallel with the design and construction of the new plant and that the Lungmen ABWR's advanced control room is different from traditional control rooms, this paper describes the difficulties encountered and overcame throughout the performance of the Lungmen FSS project.The Lungmen FSS has completed its Site Acceptance Test (SAT) and Availability Test (AVT) and is currently used for operator training. This enables operator training and licensing to be performed and completed before plant startup and commercial operation of the Lungmen ABWR.
机译:龙门先进沸水反应堆(ABWR)全面模拟器(FSS)是为新一代核电站建造的首个完全符合ANSI / ANS-3.5-1998的模拟器。龙门FSS在整个PC Windows环境中实施。其核心建模基于最佳估计的计算机代码TRACS / NEMO。一台PC托管FSS的完整建模,包括105个工厂系统的核心建模和建模。主/备用服务器配置可确保FSS连续运行。 FSS还提供了软面板功能。这使整个系统具有便携性。 本文介绍了用于龙门FSS的硬件,软件和实现过程。由于龙门FSS与新工厂的设计和施工同时进行,并且龙门ABWR的高级控制室与传统控制室不同,因此本文描述了龙门整个性能过程中遇到的困难和克服的困难FSS项目。 龙门FSS已完成现场验收测试(SAT)和可用性测试(AVT),目前正用于操作人员培训。这样一来,在龙门ABWR的工厂启动和商业运营之前,就可以完成操作员培训和许可。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号