首页> 外文会议>IPC2008;ASME international pipeline conference;International pipeline conference >BEST PRACTICES FOR THIRD PARTY PIPELINE DAMAGE RISK MANAGEMENT WITH SOCIAL AND ENVIRONMENT RESPONSIBILITY - TRANSPETRO -PETROBRAS TRANSPORTE S.A
【24h】

BEST PRACTICES FOR THIRD PARTY PIPELINE DAMAGE RISK MANAGEMENT WITH SOCIAL AND ENVIRONMENT RESPONSIBILITY - TRANSPETRO -PETROBRAS TRANSPORTE S.A

机译:具有社会和环境责任的第三方管道损坏风险管理的最佳实践-TRANSPETRO -PETROBRAS TRANSPORTE S.A

获取原文
获取外文期刊封面目录资料

摘要

The present paper describes the tasks developed along 550 kilometers of PETROBRAS TRANSPORTE South Region right-of-way where there are more than 1000 kilometers of onshore pipelines. This work was based on the company Integrity Management Program, with focus on risk reduction due to third party damage, promoting social accountability and environment preservation.On the Introduction there are presented pipeline failures stats in USA and Europe. It's visible in the stats that third party damage is one of the most common pipeline failures responsibleness. In the next topics we list the mitigation methods based on the Integrity Management Program that involves risk analysis; inspection plans based on risk; plan check and program audits. On the Detailed Plan we present standards and normal requirement for pipeline integrity: the Company GIS - Geographic Information System - where you find the pipeline data with its position and depth from ground level; the action plan to correct anomalies found during inspections; and the awareness programs performed through the Communication System to answer the solicitations registered at TRANSPETRO Call Center.We also present the social and environment Responsibility Program that includes the Identification of the communities around our right-of-way, the social and environment classification and the projects development toguaranty the installation integrity that contribute to the communities quality life raise.The Communication Plan for the stakeholders is based on API 1162 - Public Awareness Programs for Pipeline Operators. This plan is accomplished by a team of different professionals such as communication and social service professionals and others. They visit Public Officials (City Hall, Civil Defense, Fire Department, Road Police and Public Services Providers), Excavators, land owners and communities with the objective to guide and publicize safe and co-responsible manners to pipeline installations. It's remarkable the creation of especial projects in the communities along the right-of-way, such as Communitarian vegetable fields, mobile movie theaters and educational effort in high schools.We also present the results from the Integrity Program to prevent third party damage, the improvement promoted and the recommendations to make it better. At the end we present the costs involved in all actions to prevent third party damage by Brazil South Region Pipeline Operator.
机译:本文描述了在彼得罗布拉斯运输公司南部地区550公里的沿途开发的任务,那里有超过1000公里的陆上管道。这项工作基于公司完整性管理计划,其重点是降低由于第三方损害而产生的风险,促进社会责任感和环境保护。 在简介中,介绍了美国和欧洲的管道故障统计信息。从统计数据中可以明显看出,第三方损害是最常见的管道故障责任感之一。在接下来的主题中,我们列出了基于“完整性管理计划”的缓解方法,该方法涉及风险分析;基于风险的检查计划;计划检查和计划审核。在详细计划中,我们提出了管道完整性的标准和正常要求:公司GIS-地理信息系统-在这里您可以找到管道数据及其从地平面起的位置和深度;纠正检查中发现的异常的行动计划;以及通过通信系统执行的意识计划,以回答在TRANSPETRO呼叫中心注册的邀请。 我们还提出了“社会与环境责任计划”,其中包括确定我们的通行权附近的社区,对社会与环境进行分类以及将项目开发为 保证有助于社区生活质量提高的安装完整性。 利益相关者的沟通计划基于API 1162-管道运营商公共意识计划。该计划是由一支由不同专业人士组成的团队完成的,例如沟通和社会服务专业人士等。他们拜访公职人员(市政厅,民防,消防局,道路警察和公共服务提供者),挖掘机,土地所有者和社区,目的是指导和宣传安全负责任的管道安装方式。在沿途社区中创建特殊项目非常了不起,例如社区菜园,移动电影院和高中的教育工作。 我们还介绍了“诚信计划”的结果,以防止第三方受到损害,促进了改进并提出了改善建议。最后,我们介绍了为防止巴西南部地区管道运营商对第三方造成损害而采取的所有行动所涉及的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号