A ROUGH-CUT COST ESTIMATION IN A FINITE-CAPACITY STOCHASTIC ENVIRONMENT BASED ON FORCED IDLE TIME PREDICTION

机译:基于强制空闲时间预测的有限容量随机环境中的粗切成本估算

获取原文

摘要

In recent years several researchers suggested cost estimation models that consider the limited capacity of the shop. In these studies, the stochastic nature of the shop floor is modeled by a time-consuming simulation. This paper proposes five alternative rough-cut cost estimation methods that can replace the simulation. Three of five methods based on forced idle time prediction. The study compares the cost estimations derived from these methods. A cost estimation method, based on the forced idle time of the bottleneck workstation, was found to be outperform the others. As the best method, the bottleneck-based method was compared to the actual order's cost and was found as a replacement to simulation.
机译:近年来,有几位研究人员建议成本估算模型,以考虑商店的有限容量。在这些研究中,车间的随机性质是通过耗时的模拟建模的。本文提出了五种替代粗糙成本估算方法,可以取代模拟。基于强制怠速时间预测的五种方法中的三种方法。该研究比较了这些方法的成本估计。发现了一种基于瓶颈工作站的强制空闲时间的成本估计方法,以优于其他方式。作为最佳方法,将基于瓶颈的方法与实际订单的成本进行了比较,并被发现是对模拟的替代品。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号