Research on Optimization of Schedule-Cost Risk for RD Project

机译:研发项目进度成本风险优化研究

获取原文

摘要

For R&D projects, both time and cost of each sub-project are uncertain, while schedule of each sub-project has correlation respectively with the sub-project's time and cost. Based on this characteristics, the Dependent-chance programming models of optimization for schedule risk, cost risk and combined schedule-cost risk are established. Furthermore, the models are validated by calculations with method of genetic algorithm, and as a result optimizing is achieved for risk sharing, schedule and cost. This research is instructive for risk estimation of R&D project.
机译:对于研发项目,每个子项目的时间和成本都是不确定的,而每个子项目的进度计划则分别与子项目的时间和成本相关。基于此特征,建立了进度风险,成本风险和进度成本综合风险优化的相依机会规划模型。此外,通过遗传算法的计算对模型进行了验证,结果实现了风险分担,进度和成本的优化。该研究对研发项目的风险评估具有指导意义。