Analyses on schedule-cost coefficient correlation of spaceflight project based on historical statistics and its application

机译:基于历史统计的航天项目进度成本系数相关性分析及其应用

获取原文
获取原文并翻译 | 示例
       

摘要

When analyze the uncertainty of the cost and the schedule of the spaceflight project, it is needed to know the value of the schedule-cost correlation coefficient. This paper deduces the schedule distribution, considering the effect of the cost, and proposes the estimation formula of the correlation coefficient between the In(schedule) and the cost. On the basis of the fact and Taylor expansion, the relation expression between the schedule-cost correlation coefficient and the In-schedule-cost correlation coefficient is put forward. By analyzing the value features of the estimation formula of the In-schedule-cost correlation coefficient, the general rules are proposed to ascertain the value of the schedule-cost correlation coefficient. An example is given to demonstrate how to approximately amend the schedule-cost correlation coefficient based on the historical statistics, which reveals the traditional assigned value is inaccurate. The universality of this estimation method is analyzed.
机译:在分析航天项目成本和进度的不确定性时,需要知道进度-成本相关系数的值。本文在考虑成本影响的基础上,推导了日程安排,并提出了In(日程)与成本之间相关系数的估计公式。基于事实和泰勒展开,提出了进度成本相关系数与进度中成本相关系数的关系表达式。通过分析进度成本相关系数估计公式的价值特征,提出了确定进度成本相关系数值的一般规则。给出了一个例子来说明如何基于历史统计数据来近似地修正进度成本相关系数,这表明传统的分配值是不准确的。分析了这种估计方法的普遍性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号