Amending schedule-cost coefficient correlation based on historical statistics

机译:基于历史统计的进度成本系数修正

获取原文

摘要

The schedule-cost correlation coefficient is usually estimated by experts in the spaceflight project management practice. This paper deduced the schedule distribution model considering the effect of the cost uncertainty. And then theoretically analyzed and demonstrated how to amend the schedule-cost correlation coefficient according to the historical statistics based on the conditional probability distribution functions between the schedule and the cost. A general rule was put forward to ascertain the value of the schedule-cost correlation coefficient. This method was proved in analytical method. This work can correct the traditional subjective estimation method just according to the experts' experiences and expertise.
机译:进度成本相关系数通常由航天项目管理实践中的专家估算。考虑成本不确定性的影响,推导了进度计划模型。然后在理论上分析并论证了如何基于历史统计数据,基于进度与成本之间的条件概率分布函数来修正进度与成本的相关系数。提出了确定进度成本相关系数值的一般规则。分析方法证明了该方法的有效性。这项工作可以根据专家的经验和专业知识来纠正传统的主观估计方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号