Development of a harmonized approach to safety assessment of decommissioning:lessons learned from international experience (DeSa project)

机译:制定退役安全评估的统一方法:从国际经验中汲取的经验教训(DeSa项目)

获取原文

摘要

The number of nuclear facilities being or planned to be shutdown as they reach the end of their design life, due to accidents or other political and social factors has been increasing worldwide. This has led to an increase in the awareness of regulators and operators of the importance of development and implementation of adequate safety requirements and criteria for decommissioning of these facilities. A general requirement at international and national levels, even for new facilities to be commissioned, is the development of a decommissioning plan, which includes evaluation of potential radiological consequences to public and workers during planned and accidental decommissioning activities. Experience has been gained in the safety assessment of decommissioning at various sites with different complexities and hazard potentials. This experience shows that various approaches have been used in conducting safety assessments and that there is a need for harmonisation of these approaches and for transferring the good practice and lessons learned to other countries, in particular developing countries with limited financial and human resources.The IAEA launched an international project on Evaluation and Demonstration of Safety during Decommissioning (DeSa) in 2004 to provide a forum for exchange of lessons learned between site operators, regulators, safety assessors and other specialists in safety assessment of decommissioning of nuclear power plants, research reactors, laboratories, nuclear fuel cycle facilities, etc. This paper presents the lessons learned through the project up to date, I.e.;(I) a common approach to safety assessment is being applied worldwide with the following steps - establishment of assessment framework;description of the facility;definition of decommissioning activities;hazard identification and analysis;calculation of consequences;and analysis of results;(ii) a deterministic approach to safety assessment is most commonly applied;(iii) a comprehensive approach to identification of radiological and non-radiological hazards needs to be applied, as in most decommissioning projects non-radiological hazards are predominant;(iv) there is limited experience worldwide on procedures for review of decommissioning safety assessments;(v) a graded approach is being applied on the basis of various criteria and there is no internationally agreed common approach;(vi) engineering evaluation of systems and components remains a challenge due to the gradual elimination of engineering barriers, aging of a facility and dynamic decommissioning activities;(vii) more clarity and guidance is needed on the interface between safety assessment for waste management and decommissioning.It is envisaged that consolidation of the knowledge, experience and lessons learned from decommissioning in over thirty Member States will provide a useful tool for the successful performance and regulation of decommissioning and for the release of sites from regulatory control consistent with international safety standards and good international practice.
机译:在全世界范围内,由于事故或其他政治和社会因素,正在或计划在其设计寿命结束时关闭的核设施的数量正在增加。这导致监管者和运营者对开发和实施足够的安全要求以及这些设备退役的标准的重要性的认识有所提高。在国际和国家层面,甚至对于要调试的新设施,总的要求是制定退役计划,其中包括评估计划内和意外退役活动对公众和工人的潜在放射学后果。在具有不同复杂性和潜在危险的不同地点进行的退役安全评估中,已经获得了经验。这项经验表明,在进行安全评估时采用了各种方法,需要协调这些方法,并将良好做法和经验教训转移给其他国家,特别是财政和人力资源有限的发展中国家。 原子能机构于2004年启动了一个国际评价项目,“退役期间的安全评估和示范”(DeSa),为现场运营商,监管机构,安全评估人员和其他专家在核电厂退役安全评估,研究方面的经验教训交流提供了一个论坛。本文介绍了从该项目中获得的最新经验,即:(I)一种普遍的安全评估方法正在全球范围内采用,其步骤如下:建立评估框架;描述设施的用途;退役活动的定义;危害的识别和分析;后果的计算以及结果的分析;(ii)确定性的安全评估方法是最常用的方法;(iii)放射和非放射学识别的综合方法放射性危害需要应用,因为在大多数退役项目中,非放射性危害ds占主导地位;(iv)全世界在退役安全性评估的审查程序方面经验有限;(v)正在根据各种标准采用分级方法,并且没有国际公认的通用方法;(vi)工程评估由于逐步消除工程障碍,设施老化和动态退役活动,系统和组件的安装仍然是一个挑战;(vii)在废物管理和退役的安全评估之间的接口上需要更加清晰和指导。 可以预计,将在三十多个会员国中从退役中汲取的知识,经验和教训加以整合,将为成功进行退役和规范退役以及从符合国际安全标准和良好国际惯例的管制控制中释放场地提供有用的工具。实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号