首页> 外文会议>Power-Gen Asia 2006 >manuscript title:Geothermal Power – Paying for your energy supply up front – An overview of geothermal project development considerations
【24h】

manuscript title:Geothermal Power – Paying for your energy supply up front – An overview of geothermal project development considerations

机译:标题:地热发电–预先支付能源供应–地热项目开发注意事项概述

获取原文

摘要

Geothermal Power – Paying for your energy supply up front – An overview of geothermal project development considerations In these days of uncertain fossil fuel prices, geoth geothermal power presents an unusual ermal opportunity for a developer in that the large majority of their fuel costs for the life of the project can be lockedproject lockedin before producing any electricity. This allows geothermal power to be in supplied with low price volatility volatility, an important consideration in an electricity portfolio. , Understanding the risks in geothermal development can deliver long term certainty and improved bankability. With access to good geothermal expertise and a willingness to accept a certain level of risk in the early stages of field delineation (when costs are relatively low), a developer can progress quickly to the point where they can proceed with steamfield and power plant development. This paper identifies the major factors affecting the developm development of geothermal electricity and ent how variability in these factors affects the costs. These factors include development timeline, resource enthalpy, drilling success, production and injection well capacities, steamfield and power plant development costs, greenfield or brownfield status. A distinction is made between energy supply costs and energy conversion costs. A comparison with the cost of electricity produced from fossil fuels is made and demonstrates that geothermal power is a strongly competitive opt option, especially in these days of volatile (and high) fossil fuel prices. Ion, Reflecting current concerns over climate change, the impact of Clean Development Mechanism (CDM) Carbon Emission Reduction credits (CERs) is also addressed and it is shown that CERs h have the potential to significantly improve the economics of geothermal ave power.
机译:地热能–预先为您的能源付款–地热项目开发考虑因素的概述在当今化石燃料价格不确定的今天,地热能地热发电给开发商带来了难得的不小的机会,因为他们一生中的绝大部分燃料成本可以在生产任何电力之前将项目的锁定状态锁定。这使得地热能的供应具有低价格波动性,这是电力投资组合中的重要考虑因素。 ,了解地热开发中的风险可以带来长期的确定性并改善银行能力。获得良好的地热专业知识并愿意在现场描述的早期阶段(成本相对较低时)接受一定程度的风险,开发人员可以迅速发展到可以继续进行蒸汽田和发电厂开发的地步。本文确定了影响地热发电发展的主要因素,并探讨了这些因素的变化如何影响成本。这些因素包括开发时间表,资源热情,钻井成功,生产和注入井的产能,蒸汽田和电厂的开发成本,未开发或已开发的状态。在能源供应成本和能源转换成本之间有区别。与化石燃料产生的电力成本进行了比较,结果表明,地热发电是一种极具竞争力的选择方案,尤其是在当今动荡(且高价)的化石燃料价格时代。离子,反映了当前对气候变化的担忧,还讨论了清洁发展机制(CDM)的碳减排信用(CER)的影响,并表明CER h有潜力显着改善地热发电的经济性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号