Mataloko Geothermal Power Plant Development Strategy in order to Maintain the Sustainability of Supply and Demand Electric Energy in Kupang, East Nusa Tenggara (A System Dynamics Framework)

机译:Mataloko地热发电厂开发战略为了维持Kupang,东努沙腾加拉(一种系统动态框架)供需电能的可持续性

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

One of Indonesia’s problem as an archipelagic country is unequally electrification ratio, especially in Indonesia eastern region. In 2015, the electrification ratio in Kupang is 58.67%. This figure is far below from Indonesia electrification ratio, which is 88.3%. At present, people of Kupang get their electricity supply from fuel energy power system, which is costly and has a bad impact for environment. Furthermore, Indonesia has many renewable resource that has not been fully utilized and this condition in line with acceleration program of electricity infrastructure development in Indonesia, considering that Kupang has a geothermal potential in Mataloko. This research aims to develop a dynamical model of Mataloko geothermal power plant 1 x 2.5 mw development strategy in Kupang, East Nusa Tenggara from technical and economical aspect. We used system dynamics to modelling the existing electricity condition in Kupang as a base model to develop scenarios. We hope this scenario can be taken as consideration to develop a renewable resource power plant in order to fulfill the electricity demand. The result shows that geothermal potential in Mataloko is feasible to generate an electricity
机译:一位印尼的问题作为一个群岛国家是不平等的电气化率,尤其是在印尼东部地区。在2015年,在Kupang电气化比率为58.67%。这一数字是远远低于来自印度尼西亚电气化比,其为88.3%。目前,古邦的人得到燃料能源动力系统,这是昂贵和对环境产生恶劣影响的电力供应。此外,印尼还没有被充分利用,许多可再生资源,并与印尼电力基础设施发展的加速程序行这种情况下,考虑到古邦在Mataloko地热潜力。这项研究的目的是发展Mataloko地热电站,东努沙登加拉从技术和经济方面的动力学模型1×2.5万千瓦的发展战略在古邦。我们用系统动力学建模在古邦现行的电力条件作为基础模型来开发方案。我们希望这种情况可以作为考虑开发一种可再生资源发电厂,以满足电力需求。在Mataloko结果表明,地热潜能是产生电力可行

著录项

  • 作者

    Addin Aditya;

  • 作者单位
  • 年度 2017
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng