首页> 外文会议>Conference on Corrosion 2001, 2001 >MITIGATION DESIGN, INSTALLATION AND POST COMMISSIONING MEASUREMENTS FOR A PIPELINE COLLOCATED WITH AC TRANSMISSION LINES
【24h】

MITIGATION DESIGN, INSTALLATION AND POST COMMISSIONING MEASUREMENTS FOR A PIPELINE COLLOCATED WITH AC TRANSMISSION LINES

机译:交流输电线路配管的减震设计,安装和调试后的测量

获取原文

摘要

The resolution of mitigation design problems associated with an AC a transmission line collocated with a natural gas pipeline is reviewed. Mitigation design was complicated by a high level of magnetic field coupling to the pipeline and high soil resistivity along the right-of-way. The results of the computer modeled simulation, which optimized the design for touch potential control, are presented. Problems encountered in the mitigation system installation are discussed. Validation of the mitigation design was made by comparing voltage measurements made on the completed pipeline with values predicted by the computer simulation.
机译:评估了与天然气管道并置的输电线路的交流电相关的缓解设计问题的解决方案。由于高水平的磁场耦合到管道以及沿行进路的高土壤电阻率,缓解措施的设计变得复杂。给出了计算机建模仿真的结果,该仿真优化了触摸电位控制的设计。讨论了缓解系统安装中遇到的问题。通过将在完整管道上进行的电压测量值与计算机模拟预测的值进行比较,来进行缓解设计的验证。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号