MITIGATION DESIGN, INSTALLATION AND POST COMMISSIONING MEASUREMENTS FOR A PIPELINE COLLOCATED WITH AC TRANSMISSION LINES

机译:缓解设计,安装和与AC输电线路配制的管道的后期调试测量

获取原文

摘要

The resolution of mitigation design problems associated with an AC a transmission line collocated with a natural gas pipeline is reviewed. Mitigation design was complicated by a high level of magnetic field coupling to the pipeline and high soil resistivity along the right-of-way. The results of the computer modeled simulation, which optimized the design for touch potential control, are presented. Problems encountered in the mitigation system installation are discussed. Validation of the mitigation design was made by comparing voltage measurements made on the completed pipeline with values predicted by the computer simulation.
机译:综述了与与天然气管道并置的AC传输线相关的缓解设计问题的分辨率。缓解设计对沿着路线的管道和高土壤电阻率的高水平磁场耦合并发。提出了计算机建模仿真的结果,其优化了触摸电位控制设计。讨论了缓解系统安装中遇到的问题。通过比较在完成的流水线上的电压测量来进行缓解设计的验证,其中计算机仿真预测的值。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号