首页> 外文会议>SPE/DOE symposium on improved oil recovery >Water shutoff treatments in eastern alberta: doubling oil production, decreasing water cut by 20
【24h】

Water shutoff treatments in eastern alberta: doubling oil production, decreasing water cut by 20

机译:艾伯塔省东部的堵水处理:使石油产量增加一倍,将含水量减少20

获取原文

摘要

Poor primary cement jobs in the Provost area of eastern Alberta, Canada, have resulted in approximately 200 wells being classified as economically marginal. The inadequate cement bonding in these wells has caused the channeling of water from the formation below (as in Dina "C", Fig.1). Analysis of the production data supported the thesis that channeling was the principal reason for the increase in water production. In 90
机译:在加拿大艾伯塔省东部的Provost地区,初级水泥工作不佳,导致大约200口井被划为经济边际。这些井中水泥胶结不足,导致水从下面的地层中窜出(如图Dina“ C”所示)。对生产数据的分析支持了以下观点:沟渠是水产量增加的主要原因。在90

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号