首页> 外文会议>Nickel-Cobalt international symposium;Conference of metallurgists of CIM >Start-up and structural maintenance of the Jinchuan nickel giant flash furnace
【24h】

Start-up and structural maintenance of the Jinchuan nickel giant flash furnace

机译:金川镍超大型闪速炉的启动和结构维护

获取原文

摘要

This article describes start up parameters that have been developed and refined over the years at the Jinchuan Non-Ferrous Metals Corporation No.1 smelter. The special precautions taken to maintain the furnace structural integrity are emphasized and typical operating data during commissioning is also presented and compared to those of typical practice.
机译:本文介绍了金川有色金属公司第一冶炼厂多年来开发和完善的启动参数。强调了为保持熔炉结构完整性而采取的特殊预防措施,还介绍了调试期间的典型运行数据,并将其与典型实践进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号