【24h】

'Hot' jobs, bane or boon

机译:“热门”工作,无济于事

获取原文

摘要

The manufacturing community reacts to crises, directives from upper management and late orders by issuing "hot orders". This method of operating increases the priority for a particular product and expedites its flow through the factory. However, the impact of the schedule disruption on the remainder of the products' scheduled is unknown. A simulation of a medium sized electronics factory provides an opportunity to analyze the impact of this procedure on the jobs being processed. The effect of increasing the percentage of "hot" jobs on the remainder of the jobs being produced is examined. The results indicate that as the percentage of "hot" jobs increases, the time to process normal orders also increases. The establishment of an upper limit on "hot" orders will permit a factory to operate effectively and minimize disruptions.
机译:制造业社区通过发出“热命令”来对危机,从上层管理和后期订单指挥。这种操作方法增加了特定产品的优先级,并加快了流过工厂的流量。但是,计划中断对产品剩余计划的影响是未知的。模拟中型电子工厂的仿真提供了分析该程序对正在处理的工作的影响的机会。研究了增加正在制作的剩余工作的“热”就业百分比的效果。结果表明,随着“热”工作的百分比增加,处理正常订单的时间也增加了。在“热门”订单上的上限建立将允许工厂有效地运营并最大限度地减少中断。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号