Minimize the Cost of Electricity Generation with Hybrid Power Plants on Pemping Island of Indonesia using HOMER

机译:使用HOMER将印度尼西亚彭平岛上的混合电站的发电成本降至最低

获取原文

摘要

The need for electricity for remote areas, especially the foremost island in Indonesia, is important. The availability of electricity in the foremost islands of Indonesia is generally still supplied from the Diesel Power Plant (PLTD). The HSD (High Speed Diesel) price for PLTD Connection-line Pemping is assumed to be $ 0.87,- / liter with an electricity production cost of $ 0.34,-/ kWh. The intensity of solar radiation on Pemping Island is quite high, with an average of 4.875 kWh/m2/day. The simulation with HOMER (Hybrid Optimization of Multiple Energy Resources) shows the Hybrid Power Plant project can reduce the average electricity production cost to .22,-/kWh or equal to 31.52% of the current electricity production costs.
机译:偏远地区,尤其是印度尼西亚最重要的岛屿,对电力的需求很重要。印尼最主要岛屿的可用电能通常仍由柴油发电厂(PLTD)提供。假设PLTD连接管线的HSD(高速柴油)价格为$ 0.87,-/ L,发电成本为$ 0.34,-/ kWh。彭平岛的太阳辐射强度很高,平均为4.875 kWh / m 2 /天。使用HOMER(多种能源的混合优化)进行的仿真显示,混合动力发电厂项目可以将平均电力生产成本降低至0.22- / kWh,相当于当前电力生产成本的31.52%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号