Investigation of the effects of repowering options on electricity generation cost on Iran steam power plants

机译:对伊朗蒸汽发电厂重新供电的选项对发电成本的影响进行调查

获取原文
获取原文并翻译 | 示例

摘要

Many of Iran’s steam power plants are old and inefficient. Repowering as an experimented and generable way can be an effective method for reconstruction of the old steam power plants. According to the power plant specifications, there are different repowering methods. In this paper, overall conditions have been considered for choosing the most appropriate method. Thermo-economical parameters are calculated for repowering a number of Iran power plants. Expenses for repowering an existing power plant are compared with those of establishing a new gas turbine plant or a combined power plant cycles. The cost of electricity generation are calculated and compared for three different scenarios: repowering of the steam power plant, building a new gas turbine power plant and building a combined cycle power plant. The results show that repowering options not only have considerable capacity for upgrading, but also provide the lowest cost of electricity generation.
机译:伊朗的许多蒸汽发电厂都很老旧且效率低下。重新试验作为一种可再生的方法可以是改造旧蒸汽发电厂的有效方法。根据电厂的规格,有不同的供电方法。在本文中,已考虑了选择最合适方法的总体条件。计算热经济参数以为伊朗的许多发电厂供电。将为现有发电厂提供动力的费用与建立新燃气轮机发电厂或联合发电厂循环的费用进行比较。计算并比较了三种不同情况的发电成本:蒸汽发电厂的供电,新建燃气轮机发电厂和联合循环发电厂的建设。结果表明,重新供电的选件不仅具有相当大的升级能力,而且还提供了最低的发电成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号