Annual Capital Improvement Program Planning - Tools and Collaboration for Success

机译:年度资本改进计划计划-成功的工具和协作

获取原文

摘要

The Northeast Ohio Regional Sewer District's (District) Capital Improvement Plan (CIP) is a Primavera cashflow based 10-year schedule of projects consisting of both discretionary and non-discretionary projects developed by the Engineering and Construction (E&C) department. Over a course of 6-months each year, E&C must coordinate with Operations and Maintenance (O&M) and Finance, using tools such as SharePoint and P6, to prioritize discretionary projects based on available funding and staff resources. Once the CIP is finalized, E&C develops Key Performance Indicators (KPIs) to report CIP progress to the Board of Trustees and documents lessons learned to enhance the annual process.
机译:俄亥俄州东北部地区下水道区的(地区)资本改善计划(CIP)是基于Primavera现金流的10年计划,包括工程和建设(E&C)部门开发的全权和非全权项目。 E&C每年必须在六个月的过程中,使用SharePoint和P6之类的工具与运营和维护(O&M)以及财务部门进行协调,以便根据可用资金和员工资源确定可自由支配项目的优先级。一旦完成CIP的确定,E&C就会制定关键绩效指标(KPI),以向董事会报告CIP的进度并记录所学到的经验教训,以增强年度流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号