EATING AN ELEPHANT: SSO ELIMINATION PROJECT TAKES MANY BITES

机译:吃大象:SSO消除项目带来了很多麻烦

获取原文

摘要

The Western Westmoreland Municipal Authority (WWMA), located 20 miles east of Pittsburgh, PA, is implementing system improvements to eliminate Sanitary Sewer Overflows (SSOs) along Brush Creek as required by a Consent Order and Agreement (CO&A). The project was executed in multiple steps including a permanent flow monitoring program, development of a hydraulic and hydrologic model, and evaluation of alternatives. The culmination of this effort is the design and construction of a three-phase project. Phase 1 includes upgrades to an active wastewater treatment plant (WWTP) and a new 7-MG equalization (EQ) storage tank and 45-MGD pump station. Phases 2 and 3 will feature 7 miles of interceptor improvements. This presentation highlights the challenges faced during planning, design and construction of the three-phase project. These challenges include, but are not limited to, site constraints, coordination of six member-municipalities, construction in and around a stream, and addressing raw sewage pump air locking and pump vibration issues.
机译:位于宾夕法尼亚州匹兹堡以东20英里的西部威斯特摩兰市政当局(WWMA)正在实施系统改进,以根据同意书和协议(CO&A)的要求,消除沿Brush Creek的下水道溢水(SSO)。该项目分多个步骤执行,包括永久性流量监控程序,水力和水文模型的开发以及替代方案的评估。这项工作的高潮是一个三阶段项目的设计和建造。第1阶段包括升级到现役废水处理厂(WWTP),新的7-MG均衡(EQ)储罐和45-MGD泵站。第2阶段和第3阶段将对拦截器进行7英里的改进。本演讲重点介绍了在三阶段项目的规划,设计和施工过程中面临的挑战。这些挑战包括但不限于场地限制,六个成员社区的协调,溪流及其周围的建设以及解决原污水泵的气闸和泵振动问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号