首页> 外文会议>International Conference on Computing Engineering and Design >Regression Analysis Model for Estimating the Resource Needs of School Construction Projects
【24h】

Regression Analysis Model for Estimating the Resource Needs of School Construction Projects

机译:估算学校建设项目资源需求的回归分析模型

获取原文

摘要

Classrooms are the main means of education and learning activities. Based on statistics from the Ministry of Education and Culture in 2018–2019, in Indonesia there were 38,960 schools, 10,125,724 students, 358,361 classrooms, and 354,518 study groups. From a number of these classrooms there are damaged classrooms with conditions, minor damage 193,927, middle damage 26,324, major damage 20,116, and totally damage 11,548. So that junior high schools in Indonesia need to add 15,931 classrooms. School construction must be self-managed, but most in the Education unit do not have adequate human resources to be able to predict the needs of construction project resources Existing methods require special expertise, need complete data, take a long time and can be declared difficult, because there is no easy and accurate formula. Based on these problems there needs to be a solution, and this research has provided a solution that is the model. In this model there is a multiplier coefficient to determine the total cost, the amount of material, and the number of manpower in a new classroom construction project. These models are obtained from the results of research using a quantitative descriptive method approach. The primary data used were 45 random sampling data, obtained directly from the school construction committee as many as 40 data, and the project documents for which the construction was carried out by researchers were 5 data. Data analysis uses a combination of BOW method, numerical method and regression analysis method. These models have been tested for validity and the results are accurate, there is only an average difference of under 5%. Using these models, to predict school construction resources, it is enough to enter the school building area data alone, can save a lot of time, and can be used without having special construction engineering expertise.
机译:教室是教育和学习活动的主要手段。基于2018 - 2019年教育部和文化部的统计数据,在印度尼西亚有38,960名学校,10,125,724名学生,358,361名教室和354,518名研究组。从许多这些教室中,受损的教室受损,条件,伤害193,927,中间伤害26,324,重大伤害20,116,完全损坏11,548。因此,印度尼西亚的初中需要加入15,931课堂。学校建设必须自我管理,但大多数在教育单位没有足够的人力资源,能够预测建设项目资源的需求现有方法需要特殊的专业知识,需要完整的数据,花费很长时间,可以宣布困难,因为没有简单准确的公式。基于这些问题,需要成为一个解决方案,而且该研究提供了一种是模型的解决方案。在该模型中,存在乘数系数来确定新课堂建设项目中的总成本,材料量和人力人数。这些模型是使用定量描述方法方法的研究结果获得的。所使用的主要数据是45个随机采样数据,直接从学校建设委员会获得多达40个数据,以及由研究人员进行的建设的项目文件为5个数据。数据分析采用弓法,数值方法和回归分析方法的组合。这些模型已经过测试了有效性,结果是准确的,只有5%以下的平均差异。使用这些模型来预测学校建筑资源,它足以单独进入学校建筑面积数据,可以节省大量时间,并且可以在没有特殊建筑工程专业知识的情况下使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号