Applied GIS to the Monitoring of Building Work Case Study: Construction of 2000 Houses in Ghadames-Lybia

机译:应用GIS对建筑工作案例研究的监测:2000年建设Ghadames-Lybia

获取原文

摘要

Chaabane and Co Tunisian company has been contracted by "El Jihez Iskene and El Marafek Libya" to achieve 2,000 villa's in Ghadames and Derj (Nalout). The agreed implementation period was 30 months. This project covers an area of approximately 260 ha. The extent important project and the remarkable number of housing building and the diversity of construction activities (Reinforced concrete foundation, reinforced concrete in elevation, masonry, cladding, etc.) deserve the establishment of an efficient management of work through the control of the fixed time and the reserved budget. To do so, a process of planning, organization and management as well the affected resources must be put in place. This process is to break down the project managing in simple tasks or activities, to provide forecasts for these tasks and then to monitor their progress. The conventional planning tools (Primavera, Msproject, ...), generally adapted by project managers, allow a representation in time of the tasks to be performed, specifying the executions' duration and conditions of each one. However, this representation does not allow a spatial or geographic monitoring of the performed tasks within the scope of project intervention. From then, the application of Geographic Information System (GIS) complements the above monitoring tools for civil engineering projects occupying large areas on the one hand and having different types of scattered structures on the other. In fact, GIS can identify the collected data on task progress, can structure and present them in maps form in order to graphically and geographically visualize the overall progress and to conveniently extract useful summaries to the decision making.
机译:Chaabane和Co突尼斯公司已经收缩了“厄尔尼诺Jihez Iskene和El Marafek利比亚”,以实现在古达米斯和Derj(Nalout)2000点别墅的。商定的执行期为30个月。该项目占地在约260-公顷的区域。程度的重要项目和房屋建筑的显着数量和建设活动的多样性(钢筋混凝土基础,海拔,砖石包层等钢筋混凝土)通过的固定时间控制应该建立工作的有效管理并预留预算。要做到这一点,策划,组织和管理的过程,以及受影响的资源必须落实到位。这个过程是要打破这个项目的简单任务或活动管理,到为这些任务提供预测,然后监测他们的进展。传统的规划工具(Primavera的,Msproject,...),一般由项目经理调整,允许执行中的任务时表示,指定执行持续时间和每个人的条件。然而,这表示不允许的执行的任务项目的干预范围内的空间或地理监测。从此,地理信息系统(GIS)的应用补充上述监测手段土木工程项目,一方面占用很大的面积,并且具有不同类型的其他零散结构。事实上,GIS可以识别收集的数据对任务进度,可以构建并展示他们的地图,以便形成以图形和地理可视化的总体进展情况,并方便地提取有用的摘要的决策。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号