Design extension condition on PHWR accident scenario

机译:PHWR事故场景下的设计扩展条件

获取原文

摘要

This paper presents a combined accident scenario for a CANDU 600 Pressurized Heavy Water Reactor (PHWR) consisting of a design basis accident (DBA) and a sudden generator disconnection from the power grid. The scenario is considered in the hypothesis of a major earthquake, beyond the design basis (BDBA), which leads to the co-occurrence of both events. The analyzed DBA is the main steam header break. This event imposes a specific behavior from the power plant cooling systems, otherwise it causes the beginning of a severe accident progression which might evolve to a partially/fully damaged reactor core. The second event is a class IV main component failure analysis of one of the equipment. The class IV equipment failure already has a Guaranteed Shutdown State (GSS) condition which can't be achieved during a DBA. The analysis of design extension condition scenarios is suggested by the International Atomic Energy Agency (IAEA), following the Fukushima Daiichi Nuclear Power Plant accident in 2011 [1].
机译:本文介绍了CANDU 600加压重水堆(PHWR)的综合事故场景,包括设计基准事故(DBA)和发电机突然从电网断开。在超出设计基准(BDBA)的大地震假说中考虑了该场景,这导致了两个事件的同时发生。分析的DBA是主要的蒸汽总管中断。此事件使发电厂冷却系统产生特定行为,否则会导致严重事故发展的开始,可能演变成部分/完全损坏的反应堆堆芯。第二个事件是对其中一台设备进行的IV类主要组件故障分析。 IV类设备故障已经具有保证关闭状态(GSS)的条件,这在DBA期间无法实现。在2011年福岛第一核电站事故之后,国际原子能机构(IAEA)提出了对设计扩展条件方案的分析[1]。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号