【24h】

Design extension condition on PHWR accident scenario

机译:PHWR事故情景的设计扩展条件

获取原文

摘要

This paper presents a combined accident scenario for a CANDU 600 Pressurized Heavy Water Reactor (PHWR) consisting of a design basis accident (DBA) and a sudden generator disconnection from the power grid. The scenario is considered in the hypothesis of a major earthquake, beyond the design basis (BDBA), which leads to the co-occurrence of both events. The analyzed DBA is the main steam header break. This event imposes a specific behavior from the power plant cooling systems, otherwise it causes the beginning of a severe accident progression which might evolve to a partially/fully damaged reactor core. The second event is a class IV main component failure analysis of one of the equipment. The class IV equipment failure already has a Guaranteed Shutdown State (GSS) condition which can't be achieved during a DBA. The analysis of design extension condition scenarios is suggested by the International Atomic Energy Agency (IAEA), following the Fukushima Daiichi Nuclear Power Plant accident in 2011 [1].
机译:本文介绍了由设计基础事故(DBA)组成的Candu 600加压重水反应器(PHWR)的综合事故情景,以及突然发生器与电网断开连接。这种情况被认为是在一个主要地震的假设中,超出设计基础(BDBA),这导致了两种事件的共同发生。分析的DBA是主蒸汽倒立。该事件从发电厂冷却系统中施加了特定的行为,否则它会导致严重事故进展的开始,这可能会发展到部分/完全损坏的反应堆核心。第二个事件是其中一个设备的IV类主要组件故障分析。 IV类设备故障已经有一个保证的关断状态(GSS)条件,在DBA期间无法实现。 2011 [1]福岛帝茶核电站事故遵循国际原子能机构(原子能机构)的建议分析设计扩展条件方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号