首页> 外文会议>IEEE Industry Applications Society Annual Meeting >Virtual models for the upgrading electric system in Mexican refineries, application in the tender process by 2011 and integration by 2013
【24h】

Virtual models for the upgrading electric system in Mexican refineries, application in the tender process by 2011 and integration by 2013

机译:墨西哥炼油厂升级电气系统的虚拟模型,2011年招标过程中的应用和2013年集成

获取原文

摘要

That paper shows a proposal to visualize in a fast way the tentative design of an electric upgrading in a Northern Mexican refinery, and the places where the primary electrical equipment are installed, which are described in tender bases specifications, generated in electrical upgrading projects, regarded in National Refining Industry (NRI). This paper shows a requirements analysis, software alternatives and its evaluation for the development of virtual paths. The virtual models where developed with a 3D design. Those models will improve time during work in field and meeting for clarifications, that are the first stages of aproachment between suppliers which sell the electrical equipment and NRI in the tender process by 2011 and starting up by 2013.
机译:该论文显示了一种以快速方式可视化墨西哥炼油厂中电升级的初步设计,以及安装在电气升级项目中的柔软基础规格中的初级电气设备的地方进行了可视化的临时设计。在国家炼油行业(NRI)。本文显示了对虚拟路径发展的需求分析,软件替代品及其评估。使用3D设计开发的虚拟模型。这些模型将在现场工作期间和澄清期间提高时间,即在2011年之前在招标过程中销售电气设备和NRI之间的第一阶段,并于2013年开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号