EFFECTIVE OUTAGE PLANNING AND IMPLEMENTATION FOR NUCLEAR POWER PLANTS IN THE UK

机译:英国核电厂的有效停电计划和实施

获取原文

摘要

Effective outage planning and implementation is critical to the efficient and safe operation of commercial nuclear power plants in the UK. Outages are necessary for refuelling, for preventive and corrective maintenance and for major modification and improvement projects. Outages involve the support of many organisations working together and hence require high levels of coordination. Planning of activities before an outage is critical to their overall success. Establishing the integrity of power plant piping and pressure vessel components is a key objective of any outage and is the subject of this paper. It requires an understanding of the specific threats, their relationship to the overall plant conditions and the mitigating measures required to assure safe operation. Understanding the specific threats allows the engineering function of an organisation to advise on the component Minimum Acceptable Thicknesses (MATs) which can be used to assure integrity via comparison with measurements taken during outage inspections. Historically a variety of methodologies have been used to provide MATs including design drawing specified thicknesses and design code based or fitness-for-purpose methods. It is important that a robust procedure be applied to promote consistency of approach across all power station assets. This paper provides an overview of the strategy and methodologies employed to determine MATs which ensure that, over a specified inspection interval, a component would not fail by plastic collapse, creep rupture, fatigue, ratcheting or buckling and if the weld were to contain a crack-like defect at the time of inspection, it would not grow to a limiting size within the inspection interval. Readers of this paper will gain a valuable insight into the statutory outage process applicable to nuclear power plants in the UK. A particular focus of this paper is on the structural integrity assessments applied in a non-traditional sense prior to, during and after the statutory outage. As well as sharing a valuable insight into the assessment methodologies this paper highlights best industrial practice.
机译:有效的中断计划和实施对于英国商业核电站的高效安全运行至关重要。停运对于加油,预防性和纠正性维护以及大型改造和改进项目都是必需的。中断涉及许多组织的支持,因此需要高水平的协调。停运前的活动计划对其整体成功至关重要。建立发电厂管道和压力容器组件的完整性是任何中断的关键目标,并且是本文的主题。它需要了解特定的威胁,威胁与工厂整体状况的关系以及确保安全运行所需的缓解措施。了解具体威胁可以使组织的工程职能部门就组件的最小可接受厚度(MATs)提出建议,该最小可接受厚度(MATs)可通过与停机检查期间进行的测量进行比较来确保完整性。从历史上看,已经使用了多种方法来提供MAT,包括设计图纸指定的厚度以及基于设计代码或适用性的方法。重要的是,应采用鲁棒的程序来提高所有电站资产的进近一致性。本文概述了用于确定MAT的策略和方法,这些策略和方法可确保在指定的检查间隔内,组件不会因塑性塌陷,蠕变破裂,疲劳,棘轮或屈曲以及焊缝是否包含裂纹而失效。类缺陷在检查时不会在检查间隔内增长到极限尺寸。本文的读者将对适用于英国核电厂的法定停电过程获得宝贵的见解。本文的重点是在法定中断之前,期间和之后以非传统意义应用结构完整性评估。除了分享对评估方法的宝贵见解之外,本文还重点介绍了最佳工业实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号