Outage planning in nuclear power plants - a paradigm shift from an external towards an integrated project planning tool

机译:核电厂的停电计划-从外部模式向综合项目计划工具的转变

获取原文
获取原文并翻译 | 示例
       

摘要

In nuclear power plants it is common to carry out the technical planning of the annual outage work orders in an Enterprise Asset Management (EAM) system and to schedule the outage tasks in a project planning tool. The reason for this is historical: former EAM systems did not (or just to some extend) offer the necessary functionalities to realise the scheduling of the outage; graphical support for the planning was not provided at all. Consequently, a separate planning tool was employed for scheduling the annual outage.
机译:在核电厂中,通常在企业资产管理(EAM)系统中执行年度停工订单的技术计划,并在项目计划工具中安排停工任务。原因是历史悠久的:以前的EAM系统没有(或只是在某种程度上)提供实现停电调度所需的功能;完全没有提供计划的图形支持。因此,采用了单独的计划工具来安排年度停机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号