首页> 外文会议>International Conference on Structural Mechanics in Reactor Technology >DEVELOPING A FIT-FOR-PURPOSE APPROACH TO THE REGULATION OF EXTERNAL HAZARDS IN THE UK FOR THE NEW NUCLEAR REACTOR BUILD PROGRAMME
【24h】

DEVELOPING A FIT-FOR-PURPOSE APPROACH TO THE REGULATION OF EXTERNAL HAZARDS IN THE UK FOR THE NEW NUCLEAR REACTOR BUILD PROGRAMME

机译:针对新的核反应堆构建计划,针对英国制定针对外在危害的合规管理方法

获取原文

摘要

External hazards as a nuclear technical discipline has matured significantly since the last nuclear reactor build programme in the UK, in the 1980s and '90s. In part this is because of improved understanding of these hazards and their potential implications for nuclear safety, but it is also a response to a number of external hazards initiated nuclear safety challenges, most notably in March 2011 at Fukushima Dai-ichi in Japan. In addition, the UK Government recently made a policy decision to positively encourage the construction of new nuclear reactors. New nuclear reactor projects in the UK accommodate consideration of external hazards as a mainstream part of the design process, so the advent of these projects has led to a substantial increase in the demand for external hazards Suitably Qualified and Experienced Person (SQEP) resource within Office for Nuclear Regulation (ONR) to assess the adequacy of safety submissions for new nuclear reactor sites. This has prompted a re-consideration of the most appropriate way for a modern nuclear regulator, such as the ONR in the UK, to regulate in the external hazards technical area. This paper describes how the ONR now organises itself to assess external hazards safety submissions for new nuclear reactor build projects and describes the resource model currently being applied to the most advanced new build site in the UK at Hinkley Point C, which is owned and operated by EDF Energy Nuclear New Build Generation Company Ltd (NNB GenCo). The model provides the vehicle for applying ONR's regulatory processes, including how various types of skilled resources are deployed and identifies the important interfaces with other technical disciplines. Finally, the paper describes how the model will be developed for use at other new build sites in the UK.
机译:自从1980年代和90年代英国上一次核反应堆建造计划以来,作为核技术学科的外部危害已大大成熟。部分原因是由于人们对这些危害及其对核安全的潜在影响有了更好的了解,但这也是对引发核安全挑战的许多外部危害的回应,其中最引人注目的是2011年3月在日本福岛第一核电站。此外,英国政府最近做出了一项政策决定,积极鼓励建造新的核反应堆。英国的新核反应堆项目考虑到将外部危害作为设计流程的主要部分,因此这些项目的问世导致对办公室内适当合格和有经验的人(SQEP)资源的外部危害的需求大大增加核监管局(ONR)评估新核反应堆场址提交的安全性是否足够。这促使人们重新考虑对现代核监管机构(例如英国的ONR)在外部危害技术领域进行监管的最合适方法。本文介绍了ONR现在如何组织起来以评估新核反应堆建造项目的外部危害安全提交的内容,并描述了目前应用于英国最先进的新建造地点辛克利角C的资源模型,该地点由英国拥有并运营EDF能源核电新建发电有限公司(NNB GenCo)。该模型为应用ONR的监管流程提供了工具,包括如何部署各种类型的技能资源并确定与其他技术学科的重要接口。最后,本文描述了如何开发该模型以在英国的其他新建站点使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号