首页> 外文会议>International Conference on Environment and Electrical Engineering >Financial payback of solar PV systems and analysis of the potential impact of Net-Metering in Butuan City, Philippines
【24h】

Financial payback of solar PV systems and analysis of the potential impact of Net-Metering in Butuan City, Philippines

机译:菲律宾武端市太阳能光伏系统的财务回报和净计量的潜在影响分析

获取原文

摘要

The Philippines is increasing its Renewable Energy deployments, especially on grid-connected residential solar photovoltaic (PV) installations. However, the implementation of Net-Metering is still at its early stage. Electric distribution utilities in the country, including the Agusan del Norte Electric Cooperative (ANECO) in Butuan City are apprehensive about the potential impact of Net-Metering on their operations, especially on the load management. It was also not clear to these distribution utilities whether there was a potential demand for solar PV installations from their subscribers and how feasible it was to invest in solar PV systems. This paper had three primary objectives: (1) to determine if there was interest and a potential demand for solar PV among the subscribers of ANECO; (2) to determine the economic feasibility of investing in solar PV systems; (3) to simulate and analyze the potential impact of these PV systems to the current load profile of ANECO. Data were gathered from surveys conducted among the city's residents and business owners and from PV system suppliers in the country. The subscribers' profile and load information were also gathered from ANECO. The study showed that there was interest and a potential demand for solar PV systems among the subscribers of ANECO, and that investments in solar PV systems were economically feasible. Taking into consideration all potential solar PV installations in the city, it was determined that there would be a significant impact to the load profile of ANECO especially during daytime when all weather conditions are favorable. ANECO should then carefully plan their sourcing of energy supply in these conditions for proper load management.
机译:菲律宾正在增加其可再生能源的部署,特别是在并网的住宅太阳能光伏(PV)装置上。但是,网络计量的实施仍处于初期阶段。该国的配电公用事业公司,包括武端市的Agusan del Norte电气合作社(ANECO),对网络计量对其运营(尤其是负荷管理)的潜在影响感到担忧。这些配电公司还不清楚用户是否对太阳能光伏装置有潜在的需求,以及在太阳能光伏系统上进行投资的可行性。本文的三个主要目标是:(1)确定ANECO订户中是否有兴趣和对太阳能光伏的潜在需求; (2)确定投资太阳能光伏系统的经济可行性; (3)模拟和分析这些光伏系统对ANECO当前负荷状况的潜在影响。数据是从对城市居民和企业主以及该国的光伏系统供应商进行的调查中收集的。订户的个人资料和负载信息也从ANECO收集。研究表明,ANECO的订户对太阳能光伏系统存在兴趣和潜在需求,并且对太阳能光伏系统的投资在经济上是可行的。考虑到城市中所有潜在的太阳能光伏装置,确定会对ANECO的负荷曲线产生重大影响,尤其是在白天所有天气条件都有利的白天。然后,ANECO应该仔细计划在这些条件下的能源供应,以进行适当的负载管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号