首页> 外文会议>International conference on industrial applications of holonic and multi-agent systems >Agent-Based Production Scheduling for Aircraft Manufacturing Ramp-up
【24h】

Agent-Based Production Scheduling for Aircraft Manufacturing Ramp-up

机译:基于代理的飞机制造升级生产计划

获取原文

摘要

The paper presents a solution for scheduling of the aircraft production during the ramp-up phase. The developed scheduler features a combination of multi-agent systems and classical constraint logic programming algorithms. The concept of multi-agent systems is used to break down the complexity of the scheduling problem into smaller, independent sub-problems that can be solved independently and in parallel by individual agents. The selected use case is the Airbus A350 assembly line organized as a sequence of several assembly stations. Each station's schedule is computed by a single agent, however the coordination among agents takes place to handle situations when particular jobs cannot be finished in the original station, for instance due to missing parts, and have to be passed in the next station. The presented solution was developed within the European FP7 project ARUM.
机译:本文提出了在加速阶段安排飞机生产的解决方案。开发的调度程序将多智能体系统和经典约束逻辑编程算法结合在一起。多主体系统的概念用于将调度问题的复杂性分解为更小的,独立的子问题,这些子问题可以由单个主体独立和并行地解决。所选用例是按几个组装工位的顺序组织的空中客车A350组装线。每个工作站的日程安排是由一个代理计算的,但是代理商之间的协调是为了处理某些情况,即某些工作在原始工作站中无法完成(例如由于缺少零件而必须在下一个工作站中通过)。提出的解决方案是在欧洲FP7项目ARUM中开发的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号