首页> 外文会议>International conference on transportation engineering >PERIOD OPERATING METHOD: A NEW METHOD OF TRANSPORT ORGANIZATION IN CARRYING CAPACITY-RESTRICTED DISTRICT FOR RAILWAY SPEED-RAISING LINES
【24h】

PERIOD OPERATING METHOD: A NEW METHOD OF TRANSPORT ORGANIZATION IN CARRYING CAPACITY-RESTRICTED DISTRICT FOR RAILWAY SPEED-RAISING LINES

机译:期间操作方法:一种新的运输组织在铁路升温线上携带容量限制区

获取原文

摘要

Period Operating Method {POM), one way of train untwining in overcapacity section for speed-raising lines, is proposed. The basic principles of the period operating and the calculation method of carrying capacity utilization rate are enumerated. After that the general of period operating method is designed. The example analyzed indicates that under given number of trains, the utilization rate of carrying capacity goes down with the reduction of operating periods for freight trains and increase of the number of same type tracking passenger trains, which effectively alleviates the intense situation of the carrying capacity. Compared with group tracking method, this method has the advantages of higher travelling speed of passenger and freight trains, less interference and less arrival and departure tracks.
机译:提出了一段时间操作方法{POM),提出了一种在超高压部分中训练的一种方法,用于升温线。列举了期间运行的基本原理和携带能力利用率的计算方法。之后,设计了一般的操作方法。分析的示例表明,在给定数量的列车下,携带能力的利用率随着运输训练的运行期和相同类型跟踪乘客列车的数量的减少而降低,有效地减轻了携带能力的强烈情况。与群体跟踪方法相比,该方法具有乘客和货运列车行驶速度较高的优点,较少干扰和较少到达和出发轨道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号