To Build or Not to Build: The Rehabilitation Story of New York Avenue Bridge in Washington DC

机译:建造还是不建造:华盛顿特区纽约大道大桥的修复故事

获取原文

摘要

This paper highlights the innovative design accelerated construction, solutionssuccessfully implemented to address the construction challenges and alleviate the existing siteconstraints for the rehabilitation of the New York Avenue Bridge in Washington DC, locatednorth of the Union Station. The major rehabilitation items included the addition of thirdinterior (middle) girders to address redundancy concerns with the existing two-girder floorbeam-stringer grillage. In addition full-depth two-way post-tensions precast deck panels wereutilized to accommodate the 12ft-10in (max) cantilevers over the exterior girders.
机译:本文重点介绍创新设计加速施工,解决方案 成功实施,以解决施工难题并缓解现有场地 位于华盛顿特区的纽约大道大桥修复的限制因素 联合车站以北。主要的康复项目包括增加第三个 内部(中间)大梁,以解决现有两梁楼的冗余问题 梁纵梁格栅。此外,还进行了全深度双向张拉预制甲板板的建造。 用于容纳外部大梁上方的12英尺10英寸(最大)悬臂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号